

Following a fire which destroyed the majority of the electrical system for the ship loader the customer required a new design replacement electrical system. The ship Loader runs along the dockside on a common track which is used by several ship load / unload machines, this meant attention was needed with respect to the continuation of operation of the control function for the other machines on the dockside.