Tri-axis Press & Line Feed Upgrade

Tri-axis press was originally installed around 1990. The original control system was based on an Allen Bradley Pyramid integrator and a Unico digital DC drive system. Both these items are now unsupported and required replacing with a system which meets the required equipment standards.

Services

  • Project Management
  • Replacement feed line & press Electrical Drive & Control panels.
  • VS DC motors with new AC Technology
  • Complete new Power & Control Cabling
  • SCADA / HMI Control Desks & Operator Stations
  • Machine Terminal Boxes
  • Safety Gate Locks
  • New Feedback Sensors
  • Flexible Conduit
  • Principle Contractor under CDM and HSE Regulations
  • Installation
  • Commissioning
  • Operator and Maintenance Training
  • 24 / 7 Post-Commissioning Support
  • Remote access via 3G network
  • Interface to:-
  1. Bandteiler
  2. Swing Shear
  3. Stacker